fabricated and Installed new 8” spool. While also repairing the existing 3” line.
Oxygen Metering Skid - Fabricated and Installed
Standard B31.3 Piping. Fabrication and Installation Inside local Plant.
Fuel Tank - Fabricated and Coated
Tank Fabrication built to ASME code - Fabricated and Installed
Turnkey Manufacturing of a 200 Chiller Unit - Fabricated and Coated
Firewater system - Fabricated Painted and Installed
Fabricated and Painted - 1 thousand ton HVAC chiller.
Nitrogen Metering Skid Fabrication and Coating.
Boiler Turnkey Production. Fabrication, Electrical Installation, and coating.
Hydrogen Metering Skid - Fabrication and Coated
12 in Header with 6 in Nozzles fabricated to B31.3 - Fabricated and Installed for Petro Chemical Plant
Nitrogen Metering Skid - Fabricated Coated and Installed
Hydrogen Metering Station - Fabricated, Coated, and Installed
Valve Station - All pipe and steel components done by E&E.