fabricated and Installed new 8” spool. While also repairing the existing 3” line.

fabricated and Installed new 8” spool. While also repairing the existing 3” line.

Oxygen Metering Skid - Fabricated and Installed

Oxygen Metering Skid - Fabricated and Installed

Standard B31.3 Piping. Fabrication and Installation Inside local Plant.

Standard B31.3 Piping. Fabrication and Installation Inside local Plant.

Fuel Tank - Fabricated and Coated

Fuel Tank - Fabricated and Coated

Tank Fabrication built to ASME code - Fabricated and Installed

Tank Fabrication built to ASME code - Fabricated and Installed

Turnkey Manufacturing of a 200 Chiller Unit - Fabricated and Coated

Turnkey Manufacturing of a 200 Chiller Unit - Fabricated and Coated

Firewater system - Fabricated Painted and Installed

Firewater system - Fabricated Painted and Installed

Fabricated and Painted - 1 thousand ton HVAC chiller.

Fabricated and Painted - 1 thousand ton HVAC chiller.

Nitrogen Metering Skid Fabrication and Coating.

Nitrogen Metering Skid Fabrication and Coating.

Boiler Turnkey Production. Fabrication, Electrical Installation, and coating.

Hydrogen Metering Skid - Fabrication and Coated

Hydrogen Metering Skid - Fabrication and Coated

12 in Header with 6 in Nozzles fabricated to B31.3 - Fabricated and Installed for Petro Chemical Plant

12 in Header with 6 in Nozzles fabricated to B31.3 - Fabricated and Installed for Petro Chemical Plant

Nitrogen Metering Skid - Fabricated Coated and Installed

Nitrogen Metering Skid - Fabricated Coated and Installed

Hydrogen Metering Station - Fabricated, Coated, and Installed

Valve Station - All pipe and steel components done by E&E.